Bitsinex I MultiSwap

To prevent phishing and other cyber attacks, please make sure that bitsinex.com is written in the address bar!

bitcoin
Bitcoin (BTC) $ 118,171.00
ethereum
Ethereum (ETH) $ 3,017.31
tether
Tether (USDT) $ 1.00
xrp
XRP (XRP) $ 2.60
bnb
BNB (BNB) $ 689.10
solana
Solana (SOL) $ 164.20
usd-coin
USDC (USDC) $ 0.999909
dogecoin
Dogecoin (DOGE) $ 0.197593
tron
TRON (TRX) $ 0.296227
staked-ether
Lido Staked Ether (STETH) $ 3,014.58
cardano
Cardano (ADA) $ 0.719136
hyperliquid
Hyperliquid (HYPE) $ 46.06
wrapped-bitcoin
Wrapped Bitcoin (WBTC) $ 117,979.00
wrapped-steth
Wrapped stETH (WSTETH) $ 3,640.06
sui
Sui (SUI) $ 3.53
chainlink
Chainlink (LINK) $ 15.47
bitcoin-cash
Bitcoin Cash (BCH) $ 524.56
stellar
Stellar (XLM) $ 0.308027
avalanche-2
Avalanche (AVAX) $ 21.00
hedera-hashgraph
Hedera (HBAR) $ 0.202381
leo-token
LEO Token (LEO) $ 8.98
wrapped-eeth
Wrapped eETH (WEETH) $ 3,226.15
shiba-inu
Shiba Inu (SHIB) $ 0.000013
weth
WETH (WETH) $ 3,017.96
usds
USDS (USDS) $ 0.999855
the-open-network
Toncoin (TON) $ 2.99
litecoin
Litecoin (LTC) $ 95.62
whitebit
WhiteBIT Coin (WBT) $ 46.77
binance-bridged-usdt-bnb-smart-chain
Binance Bridged USDT (BNB Smart Chain) (BSC-USD) $ 1.00
monero
Monero (XMR) $ 330.09
coinbase-wrapped-btc
Coinbase Wrapped BTC (CBBTC) $ 118,213.00
polkadot
Polkadot (DOT) $ 3.97
pepe
Pepe (PEPE) $ 0.000013
ethena-usde
Ethena USDe (USDE) $ 1.00
uniswap
Uniswap (UNI) $ 8.85
bitget-token
Bitget Token (BGB) $ 4.52
aave
Aave (AAVE) $ 316.75
pi-network
Pi Network (PI) $ 0.502264
dai
Dai (DAI) $ 1.00
bittensor
Bittensor (TAO) $ 388.85
aptos
Aptos (APT) $ 4.99
near
NEAR Protocol (NEAR) $ 2.58
ethena-staked-usde
Ethena Staked USDe (SUSDE) $ 1.18
crypto-com-chain
Cronos (CRO) $ 0.098865
okb
OKB (OKB) $ 49.70
internet-computer
Internet Computer (ICP) $ 5.52
ondo-finance
Ondo (ONDO) $ 0.914559
jito-staked-sol
Jito Staked SOL (JITOSOL) $ 199.89
ethereum-classic
Ethereum Classic (ETC) $ 18.62
blackrock-usd-institutional-digital-liquidity-fund
BlackRock USD Institutional Digital Liquidity Fund (BUIDL) $ 1.00
susds
sUSDS (SUSDS) $ 1.06
ethena
Ethena (ENA) $ 0.369938
kaspa
Kaspa (KAS) $ 0.088525
usd1-wlfi
USD1 (USD1) $ 1.00
mantle
Mantle (MNT) $ 0.643718
cosmos
Cosmos Hub (ATOM) $ 4.68
vechain
VeChain (VET) $ 0.024885
arbitrum
Arbitrum (ARB) $ 0.422027
polygon-ecosystem-token
POL (ex-MATIC) (POL) $ 0.229609
official-trump
Official Trump (TRUMP) $ 10.06
fetch-ai
Artificial Superintelligence Alliance (FET) $ 0.757315
gatechain-token
Gate (GT) $ 16.40
render-token
Render (RENDER) $ 3.78
fasttoken
Fasttoken (FTN) $ 4.46
algorand
Algorand (ALGO) $ 0.222325
worldcoin-wld
Worldcoin (WLD) $ 1.10
sei-network
Sei (SEI) $ 0.337186
binance-peg-weth
Binance-Peg WETH (WETH) $ 3,018.39
bonk
Bonk (BONK) $ 0.000024
sky
Sky (SKY) $ 0.085292
filecoin
Filecoin (FIL) $ 2.63
lombard-staked-btc
Lombard Staked BTC (LBTC) $ 117,845.00
jupiter-perpetuals-liquidity-provider-token
Jupiter Perpetuals Liquidity Provider Token (JLP) $ 4.75
binance-staked-sol
Binance Staked SOL (BNSOL) $ 174.65
spx6900
SPX6900 (SPX) $ 1.64
jupiter-exchange-solana
Jupiter (JUP) $ 0.494982
usdtb
USDtb (USDTB) $ 1.00
first-digital-usd
First Digital USD (FDUSD) $ 0.998674
kucoin-shares
KuCoin (KCS) $ 11.38
kelp-dao-restaked-eth
Kelp DAO Restaked ETH (RSETH) $ 3,162.14
rocket-pool-eth
Rocket Pool ETH (RETH) $ 3,439.38
usdt0
USDT0 (USDT0) $ 1.00
fartcoin
Fartcoin (FARTCOIN) $ 1.36
celestia
Celestia (TIA) $ 1.92
pudgy-penguins
Pudgy Penguins (PENGU) $ 0.02098
nexo
NEXO (NEXO) $ 1.26
injective-protocol
Injective (INJ) $ 12.78
virtual-protocol
Virtuals Protocol (VIRTUAL) $ 1.83
optimism
Optimism (OP) $ 0.686388
xdce-crowd-sale
XDC Network (XDC) $ 0.073386
flare-networks
Flare (FLR) $ 0.016963
blockstack
Stacks (STX) $ 0.752883
mantle-staked-ether
Mantle Staked Ether (METH) $ 3,220.65
stakewise-v3-oseth
StakeWise Staked ETH (OSETH) $ 3,170.29
sonic-3
Sonic (S) $ 0.351735
story-2
Story (IP) $ 3.86
solv-btc
Solv Protocol BTC (SOLVBTC) $ 117,740.00
polygon-bridged-usdt-polygon
Polygon Bridged USDT (Polygon) (USDT) $ 1.00
tokenize-xchange
Tokenize Xchange (TKX) $ 12.94
dogwifcoin
dogwifhat (WIF) $ 1.04
renzo-restaked-eth
Renzo Restaked ETH (EZETH) $ 3,177.13
binance-bridged-usdc-bnb-smart-chain
Binance Bridged USDC (BNB Smart Chain) (USDC) $ 1.00
the-graph
The Graph (GRT) $ 0.099253
floki
FLOKI (FLOKI) $ 0.000101
immutable-x
Immutable (IMX) $ 0.514528
arbitrum-bridged-wbtc-arbitrum-one
Arbitrum Bridged WBTC (Arbitrum One) (WBTC) $ 117,862.00
syrupusdc
SyrupUSDC (SYRUPUSDC) $ 1.11
kaia
Kaia (KAIA) $ 0.160214
pax-gold
PAX Gold (PAXG) $ 3,333.56
memecore
MemeCore (M) $ 0.597302
clbtc
clBTC (CLBTC) $ 119,911.00
wbnb
Wrapped BNB (WBNB) $ 689.98
paypal-usd
PayPal USD (PYUSD) $ 0.999907
liquid-staked-ethereum
Liquid Staked ETH (LSETH) $ 3,258.91
curve-dao-token
Curve DAO (CRV) $ 0.644112
pancakeswap-token
PancakeSwap (CAKE) $ 2.52
vaulta
Vaulta (A) $ 0.550102
jupiter-staked-sol
Jupiter Staked SOL (JUPSOL) $ 184.54
tether-gold
Tether Gold (XAUT) $ 3,329.51
msol
Marinade Staked SOL (MSOL) $ 214.94
theta-token
Theta Network (THETA) $ 0.812105
gala
GALA (GALA) $ 0.017462
lido-dao
Lido DAO (LDO) $ 0.867997
ethereum-name-service
Ethereum Name Service (ENS) $ 22.47
raydium
Raydium (RAY) $ 2.77
jasmycoin
JasmyCoin (JASMY) $ 0.015022
iota
IOTA (IOTA) $ 0.185905
the-sandbox
The Sandbox (SAND) $ 0.292984
ousg
OUSG (OUSG) $ 111.75
superstate-short-duration-us-government-securities-fund-ustb
Superstate Short Duration U.S. Government Securities Fund (USTB) (USTB) $ 10.74
zcash
Zcash (ZEC) $ 43.31
jito-governance-token
Jito (JTO) $ 2.00
aerodrome-finance
Aerodrome Finance (AERO) $ 0.817628
pyth-network
Pyth Network (PYTH) $ 0.118501
pendle
Pendle (PENDLE) $ 4.11
super-oeth
Super OETH (SUPEROETH) $ 3,018.16
usdx-money-usdx
Stables Labs USDX (USDX) $ 0.998203
wrapped-hype
Wrapped HYPE (WHYPE) $ 46.08
mantle-restaked-eth
Mantle Restaked ETH (CMETH) $ 3,219.94
bittorrent
BitTorrent (BTT) $ 0.000000665628
mog-coin
Mog Coin (MOG) $ 0.000002
tezos
Tezos (XTZ) $ 0.603745
ondo-us-dollar-yield
Ondo US Dollar Yield (USDY) $ 1.09
saros-finance
Saros (SAROS) $ 0.241254
newton-project
AB (AB) $ 0.009362
cgeth-hashkey-cloud
cgETH Hashkey Cloud (CGETH.HASH) $ 3,145.70
solv-protocol-solvbtc-bbn
Solv Protocol Staked BTC (XSOLVBTC) $ 117,310.00
tbtc
tBTC (TBTC) $ 118,028.00
l2-standard-bridged-weth-base
L2 Standard Bridged WETH (Base) (WETH) $ 3,016.86
flow
Flow (FLOW) $ 0.381009
syrup
Maple Finance (SYRUP) $ 0.567227
decentraland
Decentraland (MANA) $ 0.310148
based-brett
Brett (BRETT) $ 0.059266
walrus-2
Walrus (WAL) $ 0.421991
usual-usd
Usual USD (USD0) $ 0.997926
bitcoin-avalanche-bridged-btc-b
Avalanche Bridged BTC (Avalanche) (BTC.B) $ 117,960.00
coredaoorg
Core (CORE) $ 0.554309
falcon-finance
Falcon USD (USDF) $ 0.999354
thorchain
THORChain (RUNE) $ 1.56
morpho
Morpho (MORPHO) $ 1.72
apecoin
ApeCoin (APE) $ 0.673094
starknet
Starknet (STRK) $ 0.149744
bitcoin-sv
Bitcoin SV (BSV) $ 26.79
chain-2
Onyxcoin (XCN) $ 0.015425
staked-hype
Staked HYPE (STHYPE) $ 46.10
binance-peg-dogecoin
Binance-Peg Dogecoin (DOGE) $ 0.198232
arbitrum-bridged-weth-arbitrum-one
Arbitrum Bridged WETH (Arbitrum One) (WETH) $ 3,017.29
ripple-usd
Ripple USD (RLUSD) $ 0.999887
helium
Helium (HNT) $ 2.71
true-usd
TrueUSD (TUSD) $ 0.999885
reserve-rights-token
Reserve Rights (RSR) $ 0.008295
conflux-token
Conflux (CFX) $ 0.094791
dog-go-to-the-moon-rune
Dog (Bitcoin) (DOG) $ 0.004805
venom
Venom (VENOM) $ 0.227796
dydx-chain
dYdX (DYDX) $ 0.629827
stader-ethx
Stader ETHx (ETHX) $ 3,209.28
build-on
BUILDon (B) $ 0.469428
kava
Kava (KAVA) $ 0.428283
ether-fi
Ether.fi (ETHFI) $ 1.24
dexe
DeXe (DEXE) $ 8.08
compound-governance-token
Compound (COMP) $ 48.35
bridged-usdc-polygon-pos-bridge
Bridged USDC (Polygon PoS Bridge) (USDC.E) $ 0.99991
neo
NEO (NEO) $ 6.32
usdd
USDD (USDD) $ 1.00
eigenlayer
EigenCloud (prev. EigenLayer) (EIGEN) $ 1.42
elrond-erd-2
MultiversX (EGLD) $ 15.62
apenft
APENFT (NFT) $ 0.000000443947
beldex
Beldex (BDX) $ 0.061355
deep
DeepBook (DEEP) $ 0.175159
coinbase-wrapped-staked-eth
Coinbase Wrapped Staked ETH (CBETH) $ 3,331.45
aioz-network
AIOZ Network (AIOZ) $ 0.360872
zksync
ZKsync (ZK) $ 0.059392
arweave
Arweave (AR) $ 6.47
axie-infinity
Axie Infinity (AXS) $ 2.52
telcoin
Telcoin (TEL) $ 0.00455
ecash
eCash (XEC) $ 0.000021
hashnote-usyc
Circle USYC (USYC) $ 1.09
kaito
KAITO (KAITO) $ 1.70
ether-fi-staked-btc
Ether.fi Staked BTC (EBTC) $ 118,103.00
usdb
USDB (USDB) $ 1.00

Bu Altcoin’de Balina Hareketliliği 3x Arttı, Fiyatlar Zirvelere Ulaştı: Sırada Ne Var?

Toncoin, son dönemde büyük işlem hacminde gözle görülür bir artış yaşadı. Bu durum altcoin fiyatlarına da yansıdı. İşte detaylar…

Toncoin’in balina hacmi rekor kırdı: Altcoin yatırımcıları neden ilgi gösteriyor

Toncoin ağında gerçekleşen büyük işlem hacmi, 9.03 milyar tokena ulaşarak yaklaşık 34.28 milyar dolarlık bir değere tekabül etti. IntoTheBlock verilerine göre, bu yükseliş dikkat çekici bir ivme kazandı ve yeni bir rekor olarak kayıtlara geçti. Bu durum, balina olarak tabir edilen büyük yatırımcıların ağda oldukça aktif olduğunu gösteriyor.

Son bir haftada Toncoin’de balina hareketliliği ciddi bir şekilde hız kazandı. Büyük işlem hacminin artışı, önemli piyasa oyuncularının Toncoin’e olan ilgisinin devam ettiğini ortaya koyuyor. Volatilitenin yüksek olduğu dönemlerde bile bu büyük oyuncuların piyasada varlık göstermesi, ağa duyulan güvenin bir işareti olarak değerlendirilebilir. Artemis verileri de günlük işlem sayısının 11 günün zirvesine çıktığını doğruluyor: İşlem sayısı 316 binden 382.9 bine yükseldi. Bu artış, Toncoin’in kullanımının yaygınlaştığını ve piyasada olumlu bir atmosferin oluştuğunu kanıtlıyor.

Büyük işlem hacmindeki bu sıçrama, Toncoin’in fiyat grafiklerini de hareketlendirdi. Son 24 saatte %5.28’lik bir yükselişle aylık en yüksek seviyesine ulaşan TON, üç gün üst üste kazanç elde etti. Fiyat, 3.6 dolarlık dip seviyesinden 4.2 dolarlık bir zirveye tırmandı. TradingView verileri, bu yükseliş trendinin devam ettiğini açıkça ortaya koyuyor.

Balinalar neden alım yapıyor?

Net akış verilerine bakıldığında, balinaların Toncoin’i aktif bir şekilde topladığı görülüyor. Net akış, bir gün içinde -30.52 milyondan 49.21 milyona çıkarak %261.24’lük çarpıcı bir artış sergiledi. Balinaların alım yapması, genellikle piyasada güçlü bir güvenin ve fiyatların daha da artacağına dair beklentinin göstergesidir. Tarihsel veriler de balina birikiminin yoğunlaştığı dönemlerin, talebin artmasıyla fiyat yükselişlerini tetiklediğini doğruluyor.

Analizlere göre, Toncoin için piyasa hissiyatı oldukça olumlu. Balinaların yeniden piyasaya dönmesiyle birlikte iyimserlik artıyor. Coinalyze verilerine göre, TON’un toplam fonlama oranı negatif bölgeden pozitife döndü. Bu, uzun pozisyonların kısa pozisyonlara baskın geldiğini ve yatırımcıların fiyat artışına oynadığını gösteriyor. Uzun pozisyon sahipleri, piyasa düşüşlerinde bile pozisyonlarını korumak için kısa pozisyon sahiplerine ödeme yapmaya devam ediyor. Bu durum, Toncoin’e olan talebin ve yükseliş beklentisinin güçlü olduğunu kanıtlıyor.

Balina ve bireysel yatırımcılar arasında yeniden canlanan bu olumlu hava, Toncoin’in fiyatında yeni yükselişler getirebilir. Eğer son üç gündeki trend devam ederse, TON’un 4.6 dolar seviyesini test etmesi mümkün görünüyor. Ancak, bazı satıcılar son yükselişi kâr realizasyonu için bir fırsat olarak görürse, fiyat bir düzeltme yaşayabilir ve 4.2 dolardan 3.8 dolara geri çekilebilir.

Toncoin, hem balina hareketliliği hem de artan günlük işlem hacmiyle dikkatleri üzerine çekiyor. Piyasadaki bu dinamikler, altcoinin önümüzdeki günlerde nasıl bir yol izleyeceğini belirleyecek gibi görünüyor.