Bitsinex I MultiSwap

To prevent phishing and other cyber attacks, please make sure that bitsinex.com is written in the address bar!

bitcoin
Bitcoin (BTC) $ 117,887.00
ethereum
Ethereum (ETH) $ 2,951.54
xrp
XRP (XRP) $ 2.79
tether
Tether (USDT) $ 1.00
bnb
BNB (BNB) $ 689.53
solana
Solana (SOL) $ 162.13
usd-coin
USDC (USDC) $ 0.999901
dogecoin
Dogecoin (DOGE) $ 0.198121
tron
TRON (TRX) $ 0.301031
staked-ether
Lido Staked Ether (STETH) $ 2,950.02
cardano
Cardano (ADA) $ 0.734962
hyperliquid
Hyperliquid (HYPE) $ 47.77
wrapped-bitcoin
Wrapped Bitcoin (WBTC) $ 117,631.00
stellar
Stellar (XLM) $ 0.434004
wrapped-steth
Wrapped stETH (WSTETH) $ 3,562.90
sui
Sui (SUI) $ 3.43
chainlink
Chainlink (LINK) $ 15.33
bitcoin-cash
Bitcoin Cash (BCH) $ 504.96
hedera-hashgraph
Hedera (HBAR) $ 0.226322
avalanche-2
Avalanche (AVAX) $ 21.32
leo-token
LEO Token (LEO) $ 9.03
wrapped-eeth
Wrapped eETH (WEETH) $ 3,166.96
shiba-inu
Shiba Inu (SHIB) $ 0.000013
the-open-network
Toncoin (TON) $ 3.01
weth
WETH (WETH) $ 2,951.79
usds
USDS (USDS) $ 0.999763
litecoin
Litecoin (LTC) $ 94.44
whitebit
WhiteBIT Coin (WBT) $ 46.18
binance-bridged-usdt-bnb-smart-chain
Binance Bridged USDT (BNB Smart Chain) (BSC-USD) $ 1.00
monero
Monero (XMR) $ 335.76
polkadot
Polkadot (DOT) $ 3.97
coinbase-wrapped-btc
Coinbase Wrapped BTC (CBBTC) $ 117,893.00
ethena-usde
Ethena USDe (USDE) $ 1.00
bitget-token
Bitget Token (BGB) $ 4.37
pepe
Pepe (PEPE) $ 0.000012
uniswap
Uniswap (UNI) $ 8.42
aave
Aave (AAVE) $ 304.39
bittensor
Bittensor (TAO) $ 387.68
dai
Dai (DAI) $ 0.999871
pi-network
Pi Network (PI) $ 0.465938
aptos
Aptos (APT) $ 4.95
crypto-com-chain
Cronos (CRO) $ 0.103658
ethena-staked-usde
Ethena Staked USDe (SUSDE) $ 1.18
near
NEAR Protocol (NEAR) $ 2.51
okb
OKB (OKB) $ 48.76
internet-computer
Internet Computer (ICP) $ 5.41
jito-staked-sol
Jito Staked SOL (JITOSOL) $ 197.16
ondo-finance
Ondo (ONDO) $ 0.894957
blackrock-usd-institutional-digital-liquidity-fund
BlackRock USD Institutional Digital Liquidity Fund (BUIDL) $ 1.00
ethereum-classic
Ethereum Classic (ETC) $ 18.24
mantle
Mantle (MNT) $ 0.66909
susds
sUSDS (SUSDS) $ 1.06
kaspa
Kaspa (KAS) $ 0.08481
usd1-wlfi
USD1 (USD1) $ 0.999911
cosmos
Cosmos Hub (ATOM) $ 4.64
vechain
VeChain (VET) $ 0.024347
ethena
Ethena (ENA) $ 0.328297
polygon-ecosystem-token
POL (ex-MATIC) (POL) $ 0.231236
algorand
Algorand (ALGO) $ 0.237584
arbitrum
Arbitrum (ARB) $ 0.409288
official-trump
Official Trump (TRUMP) $ 9.70
fasttoken
Fasttoken (FTN) $ 4.50
bonk
Bonk (BONK) $ 0.000025
render-token
Render (RENDER) $ 3.70
gatechain-token
Gate (GT) $ 15.92
fetch-ai
Artificial Superintelligence Alliance (FET) $ 0.708893
binance-peg-weth
Binance-Peg WETH (WETH) $ 2,954.82
sei-network
Sei (SEI) $ 0.321213
worldcoin-wld
Worldcoin (WLD) $ 1.03
filecoin
Filecoin (FIL) $ 2.55
lombard-staked-btc
Lombard Staked BTC (LBTC) $ 117,476.00
sky
Sky (SKY) $ 0.077672
quant-network
Quant (QNT) $ 113.57
jupiter-perpetuals-liquidity-provider-token
Jupiter Perpetuals Liquidity Provider Token (JLP) $ 4.72
binance-staked-sol
Binance Staked SOL (BNSOL) $ 172.23
pudgy-penguins
Pudgy Penguins (PENGU) $ 0.023839
jupiter-exchange-solana
Jupiter (JUP) $ 0.488248
usdtb
USDtb (USDTB) $ 0.999527
first-digital-usd
First Digital USD (FDUSD) $ 0.998147
kucoin-shares
KuCoin (KCS) $ 11.37
kelp-dao-restaked-eth
Kelp DAO Restaked ETH (RSETH) $ 3,094.48
spx6900
SPX6900 (SPX) $ 1.50
rocket-pool-eth
Rocket Pool ETH (RETH) $ 3,364.84
usdt0
USDT0 (USDT0) $ 1.00
celestia
Celestia (TIA) $ 1.86
nexo
NEXO (NEXO) $ 1.27
story-2
Story (IP) $ 4.26
fartcoin
Fartcoin (FARTCOIN) $ 1.24
injective-protocol
Injective (INJ) $ 12.41
xdce-crowd-sale
XDC Network (XDC) $ 0.073369
flare-networks
Flare (FLR) $ 0.016924
blockstack
Stacks (STX) $ 0.766103
optimism
Optimism (OP) $ 0.652668
sonic-3
Sonic (S) $ 0.351072
mantle-staked-ether
Mantle Staked Ether (METH) $ 3,165.69
virtual-protocol
Virtuals Protocol (VIRTUAL) $ 1.70
stakewise-v3-oseth
StakeWise Staked ETH (OSETH) $ 3,101.36
solv-btc
Solv Protocol BTC (SOLVBTC) $ 117,891.00
polygon-bridged-usdt-polygon
Polygon Bridged USDT (Polygon) (USDT) $ 1.00
binance-bridged-usdc-bnb-smart-chain
Binance Bridged USDC (BNB Smart Chain) (USDC) $ 1.00
immutable-x
Immutable (IMX) $ 0.532189
renzo-restaked-eth
Renzo Restaked ETH (EZETH) $ 3,107.24
the-graph
The Graph (GRT) $ 0.097973
dogwifcoin
dogwifhat (WIF) $ 0.960457
arbitrum-bridged-wbtc-arbitrum-one
Arbitrum Bridged WBTC (Arbitrum One) (WBTC) $ 117,597.00
syrupusdc
SyrupUSDC (SYRUPUSDC) $ 1.11
pax-gold
PAX Gold (PAXG) $ 3,351.28
tokenize-xchange
Tokenize Xchange (TKX) $ 11.71
floki
FLOKI (FLOKI) $ 0.000096
wbnb
Wrapped BNB (WBNB) $ 690.00
memecore
MemeCore (M) $ 0.57883
kaia
Kaia (KAIA) $ 0.15614
clbtc
clBTC (CLBTC) $ 118,010.00
liquid-staked-ethereum
Liquid Staked ETH (LSETH) $ 3,188.81
paypal-usd
PayPal USD (PYUSD) $ 0.999399
curve-dao-token
Curve DAO (CRV) $ 0.633645
vaulta
Vaulta (A) $ 0.535227
jupiter-staked-sol
Jupiter Staked SOL (JUPSOL) $ 182.00
tether-gold
Tether Gold (XAUT) $ 3,352.04
pancakeswap-token
PancakeSwap (CAKE) $ 2.37
msol
Marinade Staked SOL (MSOL) $ 212.05
theta-token
Theta Network (THETA) $ 0.803249
iota
IOTA (IOTA) $ 0.20499
gala
GALA (GALA) $ 0.016919
raydium
Raydium (RAY) $ 2.75
lido-dao
Lido DAO (LDO) $ 0.816447
jasmycoin
JasmyCoin (JASMY) $ 0.01504
superstate-short-duration-us-government-securities-fund-ustb
Superstate Short Duration U.S. Government Securities Fund (USTB) (USTB) $ 10.74
ethereum-name-service
Ethereum Name Service (ENS) $ 21.76
the-sandbox
The Sandbox (SAND) $ 0.293212
ousg
OUSG (OUSG) $ 111.77
zcash
Zcash (ZEC) $ 42.69
pyth-network
Pyth Network (PYTH) $ 0.119511
usdx-money-usdx
Stables Labs USDX (USDX) $ 0.998038
bittorrent
BitTorrent (BTT) $ 0.000000680831
jito-governance-token
Jito (JTO) $ 1.93
mog-coin
Mog Coin (MOG) $ 0.000002
saros-finance
Saros (SAROS) $ 0.253655
tezos
Tezos (XTZ) $ 0.631014
super-oeth
Super OETH (SUPEROETH) $ 2,951.80
aerodrome-finance
Aerodrome Finance (AERO) $ 0.775611
wrapped-hype
Wrapped HYPE (WHYPE) $ 47.78
mantle-restaked-eth
Mantle Restaked ETH (CMETH) $ 3,170.30
pendle
Pendle (PENDLE) $ 3.92
ondo-us-dollar-yield
Ondo US Dollar Yield (USDY) $ 1.09
tbtc
tBTC (TBTC) $ 117,562.00
solv-protocol-solvbtc-bbn
Solv Protocol Staked BTC (XSOLVBTC) $ 115,876.00
flow
Flow (FLOW) $ 0.383842
cgeth-hashkey-cloud
cgETH Hashkey Cloud (CGETH.HASH) $ 3,061.36
l2-standard-bridged-weth-base
L2 Standard Bridged WETH (Base) (WETH) $ 2,951.61
decentraland
Decentraland (MANA) $ 0.312779
falcon-finance
Falcon USD (USDF) $ 0.999862
newton-project
AB (AB) $ 0.008795
usual-usd
Usual USD (USD0) $ 0.997612
chain-2
Onyxcoin (XCN) $ 0.016619
helium
Helium (HNT) $ 3.06
morpho
Morpho (MORPHO) $ 1.74
bitcoin-avalanche-bridged-btc-b
Avalanche Bridged BTC (Avalanche) (BTC.B) $ 117,619.00
walrus-2
Walrus (WAL) $ 0.399279
staked-hype
Staked HYPE (STHYPE) $ 47.78
coredaoorg
Core (CORE) $ 0.538409
based-brett
Brett (BRETT) $ 0.054141
thorchain
THORChain (RUNE) $ 1.51
build-on
BUILDon (B) $ 0.524763
syrup
Maple Finance (SYRUP) $ 0.487937
bitcoin-sv
Bitcoin SV (BSV) $ 26.33
apecoin
ApeCoin (APE) $ 0.653924
ripple-usd
Ripple USD (RLUSD) $ 0.999477
conflux-token
Conflux (CFX) $ 0.100388
usdd
USDD (USDD) $ 1.00
arbitrum-bridged-weth-arbitrum-one
Arbitrum Bridged WETH (Arbitrum One) (WETH) $ 2,951.77
binance-peg-dogecoin
Binance-Peg Dogecoin (DOGE) $ 0.197774
starknet
Starknet (STRK) $ 0.137517
true-usd
TrueUSD (TUSD) $ 0.997703
1inch
1inch (1INCH) $ 0.346574
venom
Venom (VENOM) $ 0.223547
reserve-rights-token
Reserve Rights (RSR) $ 0.007884
kava
Kava (KAVA) $ 0.424937
stader-ethx
Stader ETHx (ETHX) $ 3,140.65
beldex
Beldex (BDX) $ 0.063486
dydx-chain
dYdX (DYDX) $ 0.601464
dog-go-to-the-moon-rune
Dog (Bitcoin) (DOG) $ 0.0045
bridged-usdc-polygon-pos-bridge
Bridged USDC (Polygon PoS Bridge) (USDC.E) $ 0.999901
apenft
APENFT (NFT) $ 0.000000451522
elrond-erd-2
MultiversX (EGLD) $ 15.54
neo
NEO (NEO) $ 6.22
compound-governance-token
Compound (COMP) $ 46.70
aioz-network
AIOZ Network (AIOZ) $ 0.368297
dexe
DeXe (DEXE) $ 7.59
ether-fi
Ether.fi (ETHFI) $ 1.14
coinbase-wrapped-staked-eth
Coinbase Wrapped Staked ETH (CBETH) $ 3,257.71
arweave
Arweave (AR) $ 6.46
deep
DeepBook (DEEP) $ 0.167623
ecash
eCash (XEC) $ 0.000021
telcoin
Telcoin (TEL) $ 0.004518
eigenlayer
EigenCloud (prev. EigenLayer) (EIGEN) $ 1.32
axie-infinity
Axie Infinity (AXS) $ 2.49
hashnote-usyc
Circle USYC (USYC) $ 1.09
usdb
USDB (USDB) $ 1.00
ether-fi-staked-btc
Ether.fi Staked BTC (EBTC) $ 117,263.00

HYPE Fiyatı Uçuşa Geçti! EVM Lansmanı Yatırımcıları Coşturdu

Kripto piyasasında her an yeni gelişmeler yaşanırken, Hyperliquid ekosisteminin en yeni güncellemesi yatırımcıların ilgisini çekmeye devam ediyor. HYPE token, Hyperliquid EVM’nin ana ağda başlatılmasıyla birlikte %10 değer kazanarak dikkatleri üzerine çekti. Peki, bu yükseliş kalıcı mı olacak, yoksa kısa vadeli bir ivme mi?

HYPE Coin HyperEVM Lansmanıyla Yükselişe Geçti

Hyperliquid EVM’nin (HyperEVM) ana ağda başlatılması, ağın genel işlevselliğini artırarak daha yenilikçi akıllı sözleşme geliştirmelerine olanak tanıyor. Bu güncelleme, işlemleri daha verimli hale getirirken, HYPE token için büyük bir momentum yarattı.

Bu lansmanın ardından HYPE fiyatı %10 artarak 27,32 dolara yükseldi. Ancak ani yükselişi takiben keskin bir düzeltme yaşandı ve fiyat 26,48 dolara geriledi. CoinMarketCap verilerine göre işlem hacmi %70 artarak 166,02 milyon dolara ulaştı ve piyasa değeri 8,84 milyar dolar seviyesine çıktı.

HYPE İçin Boğa Trendi Devam Edecek mi?

Bu hızlı yükselişin ardından fiyatın sürdürülebilir olup olmayacağı merak konusu. Teknik analiz göstergeleri yatırımcıların ilgisinin devam ettiğini gösterirken, RSI seviyesinin 84’e ulaşması aşırı alım bölgesine işaret ediyor.

Analistler, fiyatın 25-27 dolar aralığında dalgalanmasını beklerken, 28,38 dolar direncinin aşılması durumunda HYPE’nin 30 dolara kadar yükselebileceğini belirtiyor. Ancak destek seviyelerinin korunamaması, fiyatı 22,5 dolara kadar geri çekebilir. Kısacası, volatilitenin yüksek olduğu bir dönemde HYPE için dikkatli olmak gerekiyor.

HyperEVM Lansmanı ve HYPE’nin Geleceği

Hyperliquid EVM güncellemesi, Hyperliquid ekosisteminin genişleme stratejisinin bir parçası olarak görülüyor. Lansmanın ardından fiyatın ani yükselişi, yatırımcıların projeye olan ilgisini gösteriyor. Ancak bu seviyelerde kalıcı olabilmesi için piyasa koşullarının destekleyici olması gerekiyor.

HYPE, genel kripto piyasasındaki düşüşlerden nispeten daha az etkilenen nadir altcoinlerden biri olarak öne çıkımaya ve yatırımcıları bu konuda hayal kırıklığına uğratmamaya devam ediyor. Geliştirmelerin ve ekosistem genişlemelerinin devam etmesi, HYPE için uzun vadede güçlü bir fiyat desteği sağlayabilir. Yatırımcıların bu değişken piyasada daha da dikkatli olması ve kritik seviyeleri özenle takip etmesi büyük bir önem taşıyor.